    Default The Olive Ridley's plight continues

    Another example of how EIA (Environment impact assessment) is a joke in this country. Industries routinely suppress information and bypass the applicable legislations. First it was Tata's who were constructing port in Dhamra. Now Essar Steel is demolishing the habitat of the Olive Ridleys through fraudulent means. Sharing an article that appeared in Pioneer. Please raise your voice in support of the Olive Ridleys.
    Sabyasachi

    Life's a dredge for Olive Ridleys in Gahirmatha
    November 06, 2010 5:17:27 PM

    Moushumi Basu | New Delhi

    The world’s largest nesting site of Olive Ridley sea turtles — at Gahirmatha Marine Sanctuary in coastal Odisha — is under threat.

    This turtle season — migration has started — may spell doom for these endangered creatures since their nesting beaches have eroded drastically, thanks to alleged illegal sand-dredging by Essar Steel Orissa Ltd (ESOL) at the mouth of Mahanadi river.

    ESOL is setting up a steel pellet factory at Paradip, with an annual capacity of 6 million tonne, along with a captive power plant of 225 MW, at an investment of Rs 10,721 crore.

    According to information obtained through an RTI application filed by environmentalist Biswajit Mohanty, the company was given environmental clearance on May 29, 2008. However, it suppressed material information by not disclosing that the Coastal Regulation Zone (CRZ) was part of the total projected land requirement of 1,925 acres. The company managed to get away without even applying for CRZ clearance.

    According to experts, portions of Mahanadi river, including the applicable shoreline lands, come under CRZ due to the tidal effect in these areas.

    According to the RTI response, the company was fully aware that its project site was in CRZ. This has been revealed in its correspondence with Orissa Industrial Infrastructure Development Corporation (IDCO) in December 2008. Even senior officers like the Secretary of Steel & Mines had directed the company to seek CRZ clearance in a review meeting this January.

    Regardless of all this, ESOL has been dredging sand in the CRZ area of Mahanadi river. According to reports, at least 12,00,000 cubic metres have already been dredged.

    The RTI response also showed that a site inspection was carried out as early as in 2008, by the State Pollution Control Board (SPCB), when the company was found filling up the site with sand dredged from the Mahanadi. Nonetheless, neither the SPCB nor the Environment Department seem to have stopped ESOL.

    The company also seems to have violated the Forest (Conservation) Act, 1980. The project requires a total of 18.83 hectares of forest land and ESOL has started work since 2008 on non-forest lands without obtaining forest clearance. (According to norms, it is mandatory to get forest clearance prior to undertaking any construction.)

    The forest clearance diversion proposal and application was filed only in December 2009 with the State Government and is yet to be forwarded to Environment Ministry. Pipeline construction is almost complete in non-forest areas of Keonjhar and Jajpur districts, though there is no forest clearance.

    Meanwhile, ESOL technical assistant to the director Smriti Ranjan Das claimed, “Dredging is being done with the approval of the State Water Resource Department.” On being questioned further on whether the company had made CRZ applications, he was evasive, saying the needful must have been done as, “I joined the company after 2007”.

    The Olive Ridley is a Schedule I species under the Wildlife (Protection) Act, 1972.

    The source article can be found here: http://www.dailypioneer.com/293889/L...ahirmatha.html

  2. #2
    Join Date
    24-11-08
    Location
    Bangalore
    Posts
    16,084
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)

    Default

    Some more news -

    Conservationists worried over safety as endangered Olive Ridleys arrive
    Sandeep Mishra, TNN, Nov 9, 2010, 05.19pm IST

    BHUBANESWAR: With the endangered Olive Ridley turtles already reaching the coastal waters at Gahirmatha, concern over their safety has begun to worry conservationists.

    Since decades carcasses of the sea turtles lying along the Odisha coast, especially close to their mass nestling sites at Gahirmatha marine sanctuary and mouths of Rushikulya and Devi rivers, have been common sight. This year, too, wildlife activists feel things would be no different, notwithstanding the state government's claims of having adopted numerous measures to protect the large reptiles.

    The sea turtles, according to senior scientist (state wildlife) C S Kar, have started arriving at the shallow coastal waters in the Odisha's coast to keep their annual date for mass nestling (also called arribada), which normally starts in late October and continues till March. Odisha coast is considered the only place apart from Costa Rica to witness mass nesting by Olive Ridleys (some nestling also takes place in Mexico).

    Conservationist groups, in tune with the over decade old trend, predict a sad story: around 10,000 of these endangered guests are sure to perish. "At least 8,000 to 10,000 turtles are washed ashore every year. The putrefying bodies of Olive Ridleys are usually seen at Satbhaya, Konark, Devi river mouth and Kujang coast. Not even God can save them," said secretary, Wildlife Society of Odisha, Biswajit Mohanty.

    According to conservationists and government officials, the major reason for turtle casualty is the use of fishing nets and lack of enforcement of legal provisions. "Despite a Supreme Court guideline in 2004, intensive trawling activities continue unabated. Though it is legally mandatory the vessels refuse to use turtle excluder device (TED), a simple metallic implement which can help turtles escape without causing loss to fish catch. The government and NGOs a few years back even distributed 3000 TEDs free of cost. Yet, the trawlers have not fitted those, leading to turtles getting trapped and killed," pointed out a senior wildlife officer.

    Environmental bodies, including Greenpeace and People for Animals, have been repeatedly raising concern over the high mortality of Ridleys, listed under Schedule I of the Wildlife Protection Act, 1972. Mohanty, who is coordinator of Operation Kacchapa, said at least 1.5 lakh dead turtles have been counted on the Odisha coast since the last 15 years. "This does not include at least twice the number washed away to deep sea," he added.

    Principal chief conservator of forest (wildlife), P N Padhi, however, discounted the allegation. "We count the carcasses every year and during the turn of the millennium the annual mortality figure has sharply declined, from between 10,000 and 15,000 to between 3000 and 5000. Each year we set up a large number of onshore camps for turtle safety."

    "Between five lakh to 10 lakh turtles come to the state every year. Can a casualty rate of 0.5 to one per cent be considered high?" Padhi asked, adding, "When such a large number of turtles arrive it would be foolish to claim that there can be zero casualties. But we are taking requisite steps to protect them."

    State forest and environment secretary Arabinda Behera said the government is doing all that is necessary to ensure a "safe" journey for the turtles. "We will certainly try to curb casualty of Olive Ridleys to the maximum extent and also ensure they get conducive environment for nestling," Behera said.

    The state government, incidentally, has since the last few years made a special budgetary head for protection of turtles and also planned to establish a sea turtle research centre at Rushikulya river mouth. "The government has been taking certain measures to curb turtle mortality and banning fishing by mechanized boats (up to 10 km from the shoreline) and trawlers (up 20 km) from November to May," an officer said.

    Conservationists are, however, far from convinced and worried over the massive dredging operations for a port at Dhamra (about 12 km from the mass nesting site at Nasi Island) besides proposals for ports at Astaranga and Palur. "All the three mass nesting sites on Odisha coast are now in danger because of proposed ports. Since turtle nesting beaches are fragile and can be easily lost due to natural reasons like cyclones and tsunamis, hence it is important that all the three mass nesting sites on Odisha coast be preserved so that if one is lost the turtles still have a chance to use the other beaches. Else, Odisha will meet the same fate as Mexico, which were deserted by turtles in the 1960s because of trawling," Mohanty warned.

    Article at : http://timesofindia.indiatimes.com/h...#ixzz14s04MDCO
    Regards,
    Mrudul Godbole

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •